2014 - 2020 Hungary - Slovakia - Romania - Ukraine ENI CBC

Export all keep.eu data on this programme to Excel Export

Fundamental information

Programme website

Projects in keep.eu / partners on map

EU funding (sum of EU funding of projects in keep.eu)

Excluding technical assistance

EUR 66 556 800.00 (66 440 668.70)

Total budget

Excluding technical assistance

EUR 73 952 000.00

Total budget

Including technical assistance

EUR 81 347 200.00

Funding instrument(s)

ENPI/ENI

Eligible geographical area

Open map
Read more

Objectives, priorities and indicators

Thematic objective : Common challenges in the field of safety and security

Programme priority

  • 4.1 Support to joint activities for the prevention of natural and man-made disasters as well as joint action during emergency situations
  • 4.2 Support to the development of health

Strategic Objective

  • Address common challenges in environment, public health, safety and security

Result indicator (measurement unit)

  • RI 4.1 Risk management index (RMI) of the cross-border area (surveys)
  • RI 4.2 Medical equipment density (total density per million population, simple average of all measured equipment types in the four countries – HU, SK, RO, UA)

Output indicator (measurement unit)

  • OI 4.1a Number of co-operating organisations in disaster management (N/A)

Common output indicator (measurement unit)

  • COI30- Population covered by improved health services as a direct consequence of the support (N/A)
  • COI31- Population benefiting from flood protection measures services as a direct consequence of the support (Persons)
  • COI32- Population benefiting from forest fire protection measures services as a direct consequence of the support (Persons)
Thematic objective : Environmental protection, climate change mitigation and adaptation

Programme priority

  • 2.1 Sustainable use of the environment in the cross border area - preservation of natural resources, actions to reduce GHG emission and pollution of rivers

Strategic Objective

  • Address common challenges in environment, public health, safety and security

Result indicator (measurement unit)

  • R2.1 Increased capacity in environmental protection and climate change mitigation (Based on surveys (baseline, mid-term, final) among key stakeholders e.g. Water directorates. relevant NGOs institutions, authorities) (N/A)

Output indicator (measurement unit)

  • OI 2.1b Number of waste, wastewater, energy efficiency or renewable energy production interventions (N/A)

Common output indicator (measurement unit)

  • COI15- Surface area of habitats supported in order to attain a better conservation status (ha)
  • COI17- Number of persons actively participating in environmental actions and awareness raising activities (Number of persons)
Thematic objective : Improvement of accessibility to the regions, development of sustainable and climate-proof transport and communication networks and systems

Programme priority

  • 3.1 Development of transport infrastructure to improve the mobility of persons and goods
  • 3.2 Development of ICT infrastructure and information sharing

Strategic Objective

  • Promotion of better conditions and modalities for ensuring the mobility of persons, goods and capital

Result indicator (measurement unit)

  • RI 3.1a Increase of number of vehicles using the built, modernized transport and border management infrastructure (number of vehicles per day)
  • RI 3.1b Increase of number of passengers using transport systems improved with the support of the programme (number of passengers)
  • RI 3.2 Size of population serviced by new ICT infrastructure or information service (number of citizens served)

Output indicator (measurement unit)

  • OI3.1b Total length of newly built bicycle roads and bicycle paths (km)
  • OI3.1d Total length of reconstructed or upgraded bicycle roads and bicycle paths (km)
  • OI3.1e Number of public transport lines with increased service level as direct consequence of the support (N/A)
  • OI3.2b Number of newly developed information providers with cross border coverage (N/A)

Common output indicator (measurement unit)

  • COI26- Total length of newly built roads (Km)
  • COI27- Total length of reconstructed or upgraded roads (Kilometres)
  • COI29 - Number of additional ICT based tools developed supporting cross-border cooperation as direct consequence of the support (N/A)
Thematic objective : Promotion of local culture and preservation of historical heritage

Programme priority

  • 1.1 Promoting local culture and historical heritage along with tourism functions

Strategic Objective

  • Promote economic and social development in regions on both sides of common borders

Result indicator (measurement unit)

  • RI1.1 Increase of number of visitors of reconstructed sites (visitors)

Common output indicator (measurement unit)

  • COI6- Number of organizations using programme support for promoting local culture and preserving historical heritage (number)
  • COI7- Number of improved cultural and historical sites as a direct consequence of programme support (number)
  • COI8- Number of cross-border cultural events organised and touristic products developed using ENI support (N/A)

Information on this programme's project and partner data in keep.eu

Last month that keep.eu received data from the Programme or retrieved it from the Programme's website

3-2023

Language of the data in keep.eu

No. of projects in keep.eu / Total no. of projects (% of projects in keep.eu)

78 / 78 (100%)

No. of project partners in keep.eu / Total no. of project partners (% of project partners in keep.eu)

268 / 268 (100%)

Notes on the data

Information provided by the Programme. One project (Zero Waste) was retrieved by Interact from the programme´s website on the 2023-03-07. Achievements were retrieved by Interact from the Programme website ( https://huskroua-cbc.eu/), or a website directly linked from it, on 2024-02-01.